Intermatic RC613L Wireless Modular Radio Receiver with 36" Long Leads
Share Share Share Share Share
Rewards: 83 Points

Intermatic RC613L Wireless Modular Radio Receiver with 36" Long Leads

Responds to Signals Sent by Transmitters - Allowing You to Remotely Control Your Devices
  • Functions as On/Off switch for connected load
  • Responds to commands from wireless transmitters (sold separately)
  • Three 36" long leads

Item# 42665 EXPECTED IN STOCK 05/04/2016

List Price: $89.67
$83.07
YOU SAVE: $6.60
REWARDS: 83 points
Frequently Bought Together:

Price For Both: $143.84

  • Details
  • Specs
  • Reviews
  • Manuals
  • This modular radio receiver is one half of a two part remote control system. It operates as an ordinary On/Off switch but also responds to the signals of a hand-held transmitter - the other half of the system. The receiver is designed for indoor or outdoor use and can handle a variety of switching applications, typical around the house or farm. By the push of a button on the face of the transmitter, you'll be able to turn the connected load (lights, pump, etc.) on and off from any remote location, inside or outside of the house, safely and conveniently. In addition, a single transmitter can operate up to three receivers and is able to "teach" each module a different code (transmitter sold separately).


    • Voltage: 120/240V
    • Switch rating: DPST
    • Enclosure dimensions: 7-3/4" H x 4" W x 3-1/2" D
    • Weight: 0.7 lbs (0.3 kg)
    • Switch rating: 30 Amp Resistive; 12.5 Amp Tungsten
    • Maximum range: 100 ft
    • Agency approval: CSA/C-US
  • 1 Review

    Review of 42665 Review by JERRY
    Review of 42665
    Rating

    This unit arrived promptly and was easy to program and install. Working now exactly a it's supposed to do.

    Posted on 12/8/2013

    Leave a Review

    You're reviewing: Intermatic RC613L Wireless Modular Radio Receiver with 36" Long Leads

    • 1 star
      2 stars
      3 stars
      4 stars
      5 stars

    * Required Fields

place your order by 3pm PT for same day shipping

Please wait...